Groundwork Developments
OUR PROJECTS

Public & Private
Drainage Solutions
Our team delivers full-service drainage solutions across residential, commercial and council Auckland projects. We install stormwater and wastewater networks, subsoil systems, chambers, manholes and retention or pump tanks with a focus on accuracy, and durability. We work within both private and public networks, managing excavation, installation, testing and sign-off to ensure every system performs as designed. From complex coastal or hillside sites to
straightforward lot drainage, we provide efficient, high-quality installations supported by skilled operators and qualified drainlayers.
Whether upgrading existing infrastructure or delivering new drainage for development, Ground Work Developments offers reliable,
compliant results that support safe and environmentally conscious land development.

Beach Valley Road, Piha
Ground Work Developments delivering a high-quality reinforced concrete retaining wall on a steep, heavily vegetated site in West Auckland where access and space were extremely limited. From excavation to final shaping, the team managed every stage with precision. The wall was fully formed, reinforced, and poured on-site using engineered systems that ensured accuracy and a clean finish. Our crew coordinated plant, formwork and staging to keep the project moving safely and efficiently. Once the concrete cured, the structure was stripped and backfilled, revealing a strong, tidy retaining wall that significantly improves the stability and usability of the property.


Coastal Retaining
Wall & Platform
Construction
Ground Work Developments recently delivered a piled retaining wall project in a constrained Auckland coastal environment. Works included excavation, concrete piling, drainage installation, timber lagging and building platform formation. The site required careful coordination due to tight access, soft ground and close proximity to existing buildings. Our team installed concrete piles using specialised plant, followed by timber lagging and a full subsoil drainage system. Once structural works were complete, we formed and compacted a new level platform ready for future construction. Despite challenging ground conditions and a high-sensitivity coastal setting, the project was delivered safely, efficiently and to a high standard.